Centre des Loisirs St-Lambert

Saint-Lambert
,
Canada

CAST CONNEX^® High Strength Connectors™ are featured in the building’s architecturally exposed, seismic-resistant braced frames, both simplifying construction and enhancing the aesthetics of the steel and wood structure.

AESS

Owner: The City of St-Lambert

Architects: Leclerc architecte 

Structural Engineers: GENIVAR 

General Contractor: Kingston Byers

Steel Fabricator: Charpentes Métalliques TAG

Centre des Loisirs St-Lambert
No items found.

Centre des Loisirs St-Lambert
High-Strength Connectors used in Architecturally Exposed, Seismic-Resistant Braced Frames.
Centre des Loisirs St-Lambert
The $11.2-million facility includes a swimming pool, gymnasium, and recreation center.
Centre des Loisirs St-Lambert

Products Used On the Project